FRP Tube Pultrusion Mould

φ186*6mm FRP Tube Pultrusion Mould: Precision Large-Diameter Tooling
  • φ186mm*6mm FRP Round Tube Pultrusion Mould
  • FRP Round Tube Pultrusion Mould
  • FRP Round Tube Pultrusion Mould

φ186*6mm FRP Tube Pultrusion Mould: Precision Large-Diameter Tooling

Optimize large-scale composite production with our φ186*6mm FRP Round Tube Pultrusion Mould. Engineered with Cr12/H13 steel and hard chrome plating for high-strength, corrosion-resistant industrial piping solutions.

Executive standard

Straightness: 0.02mm Smoothness: Ra=0.025~0.012 Cavity surface hardness: < 0.02mm Boundary tolerances: ±0.3mm Plating thickness: 0.04-0.05mm Provide Customized Services

Advanced Tooling for Industrial Composite Piping

In the 2026 industrial landscape, large-diameter FRP tubes are critical for municipal water systems, chemical transport, and structural supports. The φ186*6mm FRP Round Tube Pultrusion Mould is a high-precision engineering tool designed to handle the massive internal pressures and thermal profiles associated with large-scale pultrusion. At Henan Zhongsheng (FRPZS), we focus on the synergy between the outer die and the internal mandrel to ensure perfect wall thickness uniformity and a mirror-smooth finish for high-flow efficiency.


1. Technical Mechanics of the Round Tube Mould

Manufacturing a 186mm diameter tube with a 6mm wall thickness requires more than just a hollow die. It involves precise control over the internal and external surfaces simultaneously:

  1. Internal Mandrel Support: The φ174mm internal mandrel must be perfectly centered within the φ186mm cavity. Our molds utilize a reinforced bridge design to prevent mandrel deflection under high pulling forces.
  2. Thermal Gradient Control: For a 6mm wall thickness, the exothermic heat peak must be managed. We implement four-zone heating to ensure the resin cures uniformly from the inside out, preventing internal micro-cracks.
  3. Compaction Ratio: The entrance of the mold is engineered with a 1-2 degree taper to gradually compress the impregnated fibers, forcing out air bubbles and ensuring a high-density structural matrix.


2. Premium Materials & Execution Standards

Large-diameter pultrusion places extreme stress on the mold steel. We offer several high-performance alloys to match your production volume:

  • Cr12 / Cr12MoV: The standard for high-volume glass fiber production, offering exceptional hardness (HRC 58-62) after vacuum quenching.
  • H13 (4Cr5MoSiV1): Ideal for high-temperature resins like Phenolics or Epoxies, providing superior resistance to thermal fatigue.
  • Surface Finish (Mirror Polishing): The internal cavity is polished to Ra 0.012, significantly reducing friction and ensuring the "Class A" surface required for chemical resistance.


3. φ186*6mm Mould Technical Parameters

Parameter Specification Standard Value Performance Impact
Mold Bore Diameter φ186.0 mm Ensures outer diameter precision.
Mandrel Diameter φ174.0 mm Determines the 6mm wall thickness.
Concentricity ≤ 0.05 mm Ensures wall thickness uniformity.
Straightness 0.02 mm / 1000 mm Prevents bowing in long pipe sections.
Cavity Hardness HRC 55 - 60 Resists glass fiber abrasion.
Plating Thickness 0.04 - 0.05 mm Hard chrome layer for low friction.



4. Optimized Performance Factors

  • Resin Selection: Whether using Vinyl Ester for chemical plants or Polyurethane for structural strength, our molds are compatible with all major 2026 resin systems.
  • Fiber Orientation: The mold design accommodates a mix of longitudinal rovings and continuous filament mats (CFM) to provide both tensile and hoop strength.
  • Pulling Speed: Our high-smoothness cavities allow for 15-20% faster pulling speeds compared to standard industrial molds, maximizing your ROI.

10 Professional FAQs: Large-Diameter FRP Tube Tooling

Q1: "How do you ensure the 6mm wall thickness is consistent around the entire 186mm diameter?"
A: We use high-precision centering guides and a reinforced mandrel support system that minimizes "mandrel sag" during the pultrusion process.


Q2: "What is the expected life of the chrome plating for a φ186mm mold?"
A: With proper maintenance and non-abrasive resins, you can expect 60,000 to 80,000 meters of production before needing to re-plate.


Q3: "Can this mold handle Carbon Fiber pultrusion?"
A: Yes, but for carbon fiber, we recommend H13 steel with a specialized nitriding or DLC coating to handle the specific fiber properties.


Q4: "Is the mold heated by electricity or oil?"
A: This mold is compatible with both. We provide standard mounting holes for electric heating rods or internal channels for thermal oil circulation.


Q5: "Why is the straightness tolerance so tight (0.02mm)?"
A: In industrial piping, even a slight curve makes connecting long sections nearly impossible. Straightness is the key to leak-free jointing.


Q6: "How do you prevent the mandrel from sticking inside the cured tube?"
A: The mandrel features a precision "release taper" and is polished to a mirror finish. This, combined with high-quality internal release agents, ensures smooth extraction.


Q7: "Can I use this mold for both Polyester and Vinyl Ester resins?"
A: Yes. The hard chrome surface is chemically inert and highly resistant to the styrene in polyester and the aggressive chemistry of vinyl esters.


Q8: "What is the typical length of a φ186mm tube mold?"
A: For a tube of this size, we typically design the mold length between 900mm and 1200mm to ensure full curing at high pulling speeds.


Q9: "Do you provide a technical drawing for approval before manufacturing?"
A: Every custom mold project includes a comprehensive 3D CAD design review and a 2D engineering drawing for your final signature.


Q10: "How do we clean the mold after a production run?"
A: The mold should be cleaned while warm using a brass scraper and a suitable solvent, followed by a coating of protective rust-inhibitor oil.


Expert Large-Diameter Tooling Solutions

Scale up your composite production with Henan Zhongsheng Composite Materials Co., Ltd. Led by Jessica Huang, our engineering team specializes in the design and fabrication of world-class FRP Round Tube Pultrusion Moulds.

Optimize your production line today:

Production Process

  • Engineer mould design

    Engineer mould design

  • Profile mould debugging

    Profile mould debugging

  • Rough embryo leveling

    Rough embryo leveling

  • Mold CNC machining

    Mold CNC machining

  • Mould punching

    Mould punching

  • Surface grinding

    Surface grinding

  • Cavity inner wall polishing

    Cavity inner wall polishing

  • Mold chrome

    Mold chrome

Certificate

  • Certificate
  • Certificate
  • Certificate
  • Certificate
  • Certificate

FAQ

01- Are you Trading Company or Manufacturing Factory?

We are both manufacturer trading and company. We have our own factory and we have better service ofoverseas customers. Welcome to send your inquiry!

02- I am interested in your products, could I get sample for free?

We can supply a few pieces FREE samples if we have some in stock, and you only need to pay the freight cost by yourself. Welcome to send your inquiry for FREE samples!

03- How about the Delivery time?

10-15days after receiving the deposit based on the MOQ. Normally, 30-35days to finish the order for a 20ft container. Welcome to ask for the detailed delivery time according to your order quantity!

04- How can you guarantee the product quality?

Our whole production lines and products have been certificated by IS09001:2015, and it's been followed strictly. We also have the professional QC team, and each our package worker will be in charge of the final inspection according to the QC instruction before packing.

05- What is about the payment terms.

Basically, the payment terms areT/T,L/C at sight. Western Union, Paypal, Moneygram, Alipay Credit card are acceptableforsample order.

06- Can you do OEM for me?

We accept all OEM orders,just contact us and give me your design,we will offer you a reasonable price ASAP.

Client Feedback

  • The quality of the product is very good, all performance tests have passed, and the service attitude of the docking staff is very good

    CUSTOMER FEEDBACK

    Clyde
    Engineer, From india

  • Compared with our local products, the quality of this batch of profiles is quite good, it is worth recommending

    CUSTOMER FEEDBACK

    Devin
    CEO, From Germany

  • The engineer has comprehensive professional knowledge, answered many questions, and put forward many useful suggestions, which made the plan more perfect

    CUSTOMER FEEDBACK

    Aaron
    CTO, From Mexico

Get Quote & Solution

*From:
*Mesage:
Get Quote & Solution
*From:
*Mesage: